• 494/169 Design-Build

    Objective: Reconstruct the most heavily traveled interchange in Minnesota while maintaining optimal traffic flow and minimal congestion over the... Read More
  • TH 610 Design-Build

    C.S. McCrossan led efforts to extend TH 610 from TH 169 west to CSAH 81. The project constructed 2.75 miles of new, urban, four-lane divided freeway... Read More
  • METRO Green Line

    This 11 mile project is the second Light Rail Transit project that C.S. McCrossan performed work on, the first being the Hiawatha Light Rail Transit... Read More
  • TH 169 & CSAH 81

    Formerly considered one of the most congested and dangerous intersections in the area (often referred to as the Devil's Triangle), this $50M project... Read More
  • Columbia Heights Pedestrian Bridge

    C.S. McCrossan constructed a 170' long prefabricated pedestrian bridge with a concrete switchback ramp approach on the west side and a concrete... Read More
  • MSP Airport Tunnel

    Runway 4-22 is the longest runway at Minneapolis International Airport -- about 11,000 feet long -- and it is used on occasion for the arrival and... Read More