• 494/169 Design-Build

    Objective: Reconstruct the most heavily traveled interchange in Minnesota while maintaining optimal traffic flow and minimal congestion over the... Read More
  • TH 610 Design-Build

    C.S. McCrossan led efforts to extend TH 610 from TH 169 west to CSAH 81. The project constructed 2.75 miles of new, urban, four-lane divided freeway... Read More
  • METRO Green Line

    This 11 mile project is the second Light Rail Transit project that C.S. McCrossan performed work on, the first being the Hiawatha Light Rail Transit... Read More
  • TH 169 & CSAH 81

    Formerly considered one of the most congested and dangerous intersections in the area (often referred to as the Devil's Triangle), this $50M project... Read More
  • Columbia Heights Pedestrian Bridge

    C.S. McCrossan constructed a 170' long prefabricated pedestrian bridge with a concrete switchback ramp approach on the west side and a concrete... Read More
  • MSP Airport Tunnel

    Runway 4-22 is the longest runway at Minneapolis International Airport -- about 11,000 feet long -- and it is used on occasion for the arrival and... Read More
  • Elm Creek Dam

    The original Elm Creek dam was built in 1885 to provide water power for the flour mill located on River Road in Champlin, Minnesota.  The next... Read More