HomePortfolioBituminous PavingI-494 / TH 169 Design-Build

I-494 / TH 169 Design-Build

The object of this project was to reconstruct the most heavily traveled interchange in Minnesota while maintaining optimal traffic flow and minimal congestion over the course of two years.

Owner: MnDOT

Location: SW Metro Minneapolis, MN

Contract Value: $128,000,000

Challenges: Many, including overcoming a State Government shutdown in mid-summer 2011 during the height of construction season as well as orchestrating coordination with all major utility owners to completely relocate all facilities in the corridor to a joint trench option.

Structures: 9 new bridges, 3 bridge widenings, 30 retaining walls and 55,000 sf of wood noise wall.

Scope: 4.5 million lbs. of new structural steel for bridges, 4.2 million lbs. of rebar, 45,000 cubic yards of structural concrete and 37,000 cubic yards of pavement concrete.

Result: The 494/169 Design-Build was completed on time and on budget.

Awards:

  • AASHTO National “Under-Budget” Winner $25 – 200 Million Category
  • MnDOT Safety Award
  • MnDOT Bridge Award